Tuesday, March 16, 2010

Day two putting the sub rafters in.

After some thought I changed the pitch of the sub rafters from 600mm to 400mm as the insulation can be used with 400 and 600 spacing. Some grainy night time phone pictures of half of the base with all the rafters in place.





Monday, March 15, 2010

Half of the base is built

Here is a picture of half of the base frame. It is made from 3.6m x 150mm x 50mm CLS timber main rafters that are supported by 75mm x 75mm posts fitted in to 600mm steel fence spikes.
The base will then have secondary 63mm x 38mm CLs Timber rafters every 600mm.with 100mm of recycled plastic bottle insulation between each rafter.

Friday, January 29, 2010

The Plans for Modular Flat Pack Home Office

.

The artists impressions for Modular Flat Pack Home Office drawn by Midge It.

The back view of the Home Office




The Front view of the Home Office 



The West side view of the Home Office



The East side view of the Home Office.



The Internal plan view of the Home Office.



The looking East at the Home Office plot.




The looking West at the Home Office plot.