Thus the Bodgeit and Midgeit Workshop Build begins after Easter The base has take a long time to to build mainly due to clearing the site of the 12' high Miscanthus grass and the 5' diameter pampas grass that once was growing here. Since starting I have now had 3 Serious PSVT attacks.
Next Job Fitting the Flooring ready for the Walls to be Bolted on.